3D model construction,disassembly,equipmentproduction
Save 70% labor and triple efficiency
Previously, the labor cost for producing one blade was 8 yuan, but now it
onlycosts 2.5 yuan to produce over 1000 blades per day
Valve products are aesthetically pleasing, with good sealing and highconsistency
Screw connection without welding process and no need for repainting
Real time display of traceable production process
Real time display of production data for each process on a digital largescreen